Coal-fired power plant Datteln / unit IV

  • Delivery of pipe DN 2,600 in prefabricated supply lengths of 21 m
  • Lfting in 21 m lengths with a crossbeam
  • Placing supply pipes between the cooling tower bases
  • Supply and outflow pipes in an open trench
  • Installation of Spool 2
Client
E.ON / Uniper
General Contractor
E.ON
Scope of services
Planning, delivery, prefabrication and installation
Component
Main and secondary cooling water pipelines
Plant
Hard Coal Plant 800 MW
Material
Epoxy vinyl ester resin liner and laminate structure isophthalic acid resin
Installation
Overground and underground
Medium
Cooling water
Design temperature
50 ° C
Pressure stages
4 bar / -0.5 bar
SLW 60
Nominal diameter
DIN 50 – 2,600